Showing posts with label Running. Show all posts
Showing posts with label Running. Show all posts

Sunday, November 13, 2011

Running Water

Running Water Video Clips.





OK, here are some nature clips of running water.................IN COLOR WITH NATURAL SOUND! No, black and white infrared, no funky colored skies, no sound effects added, no "silent movies" and no added music! The only on site effetcs were the occasional use of a polarizing filter and slow shutter speeds in two sequences. The only image edits were the fade from and to black, the fades between the scenes, some minor color corrections, some minor gain reduction, some video noise reduction and some added stereo "sound spreading". Uploader's Note This is the last major video shoot that I will be doing of this place untill mid-October when the leaves turn color. With the on and off bad weather that's been hitting the NY Tri-State area over the past 5 days I decided to go to the Ramapo Reservation and tape the Ramapo River and the brook along the Waterfall Trail as the rainfall made their levels higher and more active..............and louder! Note the two large branches at the base of the waterfall!

Keywords: Ramapo, Reservation, river, Mahwah, NJ, nature, waterfall, whitenoise

foldable chaise lounge roam stainless steel portable ice maker

Friday, July 22, 2011

Construction Stop Motion

Construction Stop Motion Tube. Duration : 3.77 Mins.


And 'den to keep the flow of water from the jet in a nearby town. The trench is 50 feet wide and will stretch 4.5 miles. The pipe is a 18 "precast concrete pipes. Every mile there is a 19 'water line that connects the principal at a turning point that the closure of water to the filters with the Atlantic Ocean. Maitani for you is a 40 "valve chamber, 120" tree connection. There are no lines in the city, will also need to run pipe to the city. This isuse watershed 20 4'x4 'that run a block for 10 miles. Connecting to the catchment area is a 3 'iron pipe, which is to connect a 3 "diameter main pipeline that is on a 10 for 4 miles' stretch the 10 miles to the hose will reach 12" to be. For each key is a 12 "blow-off chamber. For the 4 miles there are 12 to be" piping. Every mile will need two 2'x4 'catch basin on each side of the road. Connection to the tank 12 'is the main line pipe steel in 3' iron. Oncereached the watershed is a 180-degree turn, the pipe will be divided into 4 parts. On the main line is a 4-seam section, 8 feet of run 3 "pipes. At the end of the three pipes each pipe pipe", 3 'We are dirty with project costs. 86 million.

Keywords: Construction, Stop, Motion, excavators, excavator, cranes, trucks, cars, diesel, gas

berlei maternity bras